Not enough info essentially and (maybe) not tested on Eurofighter’
Edit: nevermind. Community Bug Reporting System Diehl BGT Defence HOSBO Glide Bomb
Then its a simple case of: Gaijin lazy
Not enough info essentially and (maybe) not tested on Eurofighter’
Edit: nevermind. Community Bug Reporting System Diehl BGT Defence HOSBO Glide Bomb
Then its a simple case of: Gaijin lazy
the funds for the 20 T4+/T5s was allocated today
and also P3Ec and EK Step 1
i realy dont know where to check it everytime
Was the AMK one today as well, and where to check if it was decided to fund it?
Do we know what the difference will be between the T4 and the T5 yet?
the name

AMK and DASS and Radar obsolescence stuff is on 2025-11-15
EF ESCAN Early Embodyment 2025-12-03
P4E DQ 2026-07-08
EF LTE 2026-01-14
new radios 2026-02-25
HEA NF and ESCAN Mk1 Step 2 TBM 2026-09-23
the tranche itself is, like before, mostly just a production run. it’ll be built to whatever standard is available. T4 should be like P3Eb or something, T5 likely P4E or LTE, smth like that
Tranche 5 should have that new cockpit that was shown a while back
yeah that should be part of P3Ec or P4E
More computing power for integrating drone at least.
T5 might come with fully integrated AMK as well, if it gets decided as such
I know it never will happen but i want my T5 with the EJ230 with TVC
who knows. maybe its ready by then
the standard has to be like reliable by the time they do the planning though
There is a whole lecture about it in munich/online on the 29th october
Likely sth a lot of us should watch?
Gonna be hard for me, its my birthday
@Gunjob @Flame2512 @Morvran for all you other eft lovers as well.
Sth to take note of. The lecture is in english as well and not in german
I might have to see if there is a recording of it afterwards. Im busy at that exact time :D
But might get back intime to see some of it
Cant wait for Tranche 5 In game (cope)
English:
Eurofighter Tranche 5
The Budget Committee of the German Bundestag approved the procurement of additional Eurofighters in Tranche 5, including engines and spare and replacement parts. The fighter jets will be equipped with a modern radar with electronic beam scanning, the so-called EScan radar. The contract is valued at a total of approximately 3.75 billion euros and is to be financed from the regular defense budget. Delivery of the aircraft to the Bundeswehr is planned for the period from 2031 to 2034. The Eurofighter is the mainstay of the German combat aircraft fleet. The procurement of Tranche 5 serves to gradually transfer the capabilities of the aging Tornado fighter jet in the area of Electronic Combat and Reconnaissance (ECR) into a future-proof platform with which Germany will continue toNATONorth Atlantic Treaty Organization-will fulfill its obligations.
Weiter hohes Tempo bei Bundeswehr-Beschaffungen Weiter hohes Tempo bei Bundeswehr-Beschaffungen
Im hoping we dont have to wait that long for most the upgrades.
CAPTOR-E hopefully will come to the Typhoons we already have.
Striker II could come to them as well
Meaning the only meaningful changes for T5 would probably be the different cockpit and maybe slightly better EW?
After that its just AMK.
+possible the AMK kit if its chosen
Maybe the EJ230 engines (Cope)
AMK + EJ230 would be awesome (are those the TVC as well, or just uprated output?