Storm Warning - Rumor Round-Up & Discussion (Part 2)

Eh, the design and initial production was Hawker, Contract was signed in '72, first flew in '74, entered service in '76, and the sale of Hawker Siddeley to BAE wasn’t until '77

2 Likes

12th December, maybe

Yes it is still being released before Christmas, most likely w/c 16th

no devblog, trailer, devstream or devserver with 2 weeks left is crazy though… Thats so much stuff to happen over 2 weeks time.

who tumble dried a Gannet, the label says line dry!

1 Like

When is Christmas this year? Isn’t there about two weeks left?

it is exactly 3 weeks until Christmas as of the 4th

25 December?

@Smin1080p_WT what’s the typical time frame of suggestions being passed to developers to then being read by a developer?

Just out of interest when do the staff come back after the christmas break ?

1 parsec

1 Like

lmao

Yeah, but this is nothing unusual for December update, like in 2020 the first devblog was the 7th of December and the patch dropped on the 18th of December, it’s all fine

Oh, oh, a parsecs is a measure of distance. Well, it’s not the point, the main thing is that it’s SOOO long

Passed to the devs means its been sent to the devs by that point.

1 Like

2020 was similar with a large and late Nov update

1 Like

J-11B Blk 2 IR missile PL-8 & PL-8B

J-11BH from PLANAF spec like J-11B Early (Blk 2)

J-11B Block 9 only armed PL-10, and battle rating higher J-11B Block 2

J-11B Blk 9 it might be the early 4.5 generation fighter aircraft because engine and radar better J-11B Early (Blk 2)

1 Like

It depends on each staff really.

6 Likes

And they read the suggestions immediately?

As im not standing directly behind their desks looking at their screens, thats pretty impossible for me to say :)

But if something is passed to the devs, it means its been sent for their consideration already.

10 Likes