Major Update "Line of Contact" - Rumor Round-Up & Discussion (Part 2)

YF-23 mentioned

yf23-my

3 Likes


5 Likes

I would just stress right now before the pings, Gripen E is not final. Its still in its configuration stage.

18 Likes

I hope there are finally some new physics additions, such as Merkava’s famous chains (specially since the Namers already have them), the CR2s’ back hanging cages or many of the flappy mudguards across many tanks like M10 and M1A2T…

Or maybe even some MBT fixes, or even regenerative steering!

Watch them still ignore you lol

I give it an hour at most.

6 Likes

you could say this in every lango and still have people complain

An hour, I say half :3

Im suprised its even there considering how fresh this model looks, but thank you for putting up with us over this fella Smin :p

Its as fresh as they can be. Literally hot off ))

3 Likes

Are those AL41F1S final???

1 Like

The engines are the biggest ? of the SM2 upgrades

Wouldnt be suprised if thats the final model

Is there any difference between SM and SM2 ordnance-wise?

Thought the 41s where 14500kgf

Extra CM?

Oh are those the new engines?

1 Like

Statcard shows installed thrust, also probably missing engine mod

Real number is probably 13500

1 Like

I wonder if the MiG-29SMT is the same way then or if it is still missing thrust actually

no

So, since there is SU30SM2 which is basically a SU35 with 2 seat, is USA and Israel going to counter this with scraps from 2000s?