0 panther hulls were ever allocated to the 314 project - anything multiplied by 0 = 0.
You should go please yourself - you are obviously better suited to that rational discussion.
@Josephs_Piano, the Coelian was far above 0% completion. They were just about to begin serial production, when a new demand for a 55mm armament stopped them and after that change was implemented it was only the allied bombardments and scarce ressources stopping production.
AFAIK no panther hulls were ever allocated, nothing more than a turret mock-up was ever made, and your “about to enter production” is actually the design being finalised - which is definitively not the same thing at all.
Mounting 2 x 55mm Gerat 38’s on a Panther hull was never more than a drawing either.