Notice how it only says k-27a and not r-27a. The project was cancelled was not completed.
The seekerhead existed and even upgraded ones that were meant to be used for the eventual k-27ea materialized but was never tested
Well, if it was private Chinese order, info might only exist in internal documentation of manufacturing plant or design bureau.
1 Like
that happened 2 months ago
Stupid mods i swear.
the post being hidden has nothing to do with the forum mods

For what reason? I didn’t say nothing bad
Their system is broken
1 Like
Dm a forum mod and post a link to your post, they will reinstate it if it’s nothing bad
i will thx
bruh its got completly removed
We should get upgraded r27ets together with python 4 before we get the big fox 2 patch. Cause adding them later would mean they’re doa
These are ukranians
I was talking about the MiG-31
Cool i guess, but why not just Su-35 instead :(
They gave us mini su35 apparently
2 Likes
i hope they work on tvc, tvc now just only up and down
who dis?





