maybe
likely because 1. its in russian hence they can access it 2. they just want to nerf m830a1 3. some intern suggest it so gaijin “fixed” it
because there is no bug report on it, or anything really
Warspite is definitely without HE-VT. HE-VT put in battlefield service even in USN at 1942 December, and Warspite ingame is earlier than that.
knowing that there are still a lot of light/ifv vehicles not in the game i presume ther will be coming a lot of them coming and that woult make it more interesting.
For ground, MBTs/medium tanks generally tend to be more appearing to a more general and wide audience, so there being a lot of light vehicle options doesn’t mean that a lot are coming any time soon.
I mean last year they focused almost exclusively on adding new LT/IFV when it came to new top tier ground content.
only new (non premium) MBTs we got at rank VII and above were the 2A7HU, 120S, Sabra Mk.1 and 2A4/2A5/2A6NL.
So 2 were 10.0 and below, 3 were just almost completely C&P and only 1 was a somewhat unique, needed and top tier.
That is for planes with plenty of CMs, with low CM counts like 48 or 56 u struggle to do this without having to either rat the entire time or turn and run. I still remember having to dodge AIM54s in my J7E back in the day. I was so confused the first time a phoenix just knocked me out of the sky. It would be similar for Meteor and R37M. I mean the multipath is the only thing I have RN to not ‘die’ to missiles when I am out of chaff.
I do wonder if we will get any new systems in the next update, there is always the idea of LOAL for ground based IR SAMs which would be neat
Its possible. I would not be surprised it if was not added tho.
Hopefully, it’s almost the only way for them to be better than the current SACLOS ones if they add DL + LOAL
The only thing I expect from the new patch is AIM-9X.
I wouldn’t get my hopes up there tbh
Stinger K in the corner.
Is that a sign? 👀
This is a sign
“No”
It is a sign is it not
“Negative”
Opening Program,
Progressing 5%,
Progressing 25%,
Progressing 50%,
Progressing 75%,
Completed 100%,
Error has occurred,
Patient file was not found please request another action immediately.