M829A3 Bug report advice

Hi, im putting together a bug report for the implementation of M829A3 and would appreciate any advice. My report details and proves that M829A3 does not use a steel tip anti ERA assembly and instead is a 806.5x25mm DU longrod. The method of defeating K5 ERA is just shear brute force from the material strengh of the thick rod. This implementation would boost the flat pen from 634mm at 10m to over 700 at 10m





If there is anything incorrect please point it out. Thankyou

1 Like

Just realized i forgot to remove an incorrect source from the body of the argument where it was removed from the appendix. Ignore source FY2003/2004 DOT&E annual report as this has no mention of the design of m829a3

There was also an error in the maths that im correcting now, Will reply again with a fixed version of the document





Here is a fixed version. Love spotting so many errors within minutes of posting

1 Like