Introduction
The Eurofighter Typhoon’s development began in the early 1980s as a multinational collaboration to create a highly agile, multi-role fighter to replace aging fleets in European air forces. Initially known as the European Fighter Aircraft (EFA) program, it was spearheaded by the UK, Germany, Italy, and Spain, with France also being involved initially, but soon diverging into a development that lead to the Rafale. The project faced numerous delays due to technical challenges and political disagreements, particularly over cost-sharing and work distribution among partner nations.
The aircraft’s first prototype, the DA1, flew on 27th March, 1994, marking a major milestone. Official production began in the late 1990s under a consortium led by Airbus, BAE Systems, and Leonardo. The final design consisted of a delta-wing and canard configuration for superior maneuverability and rapid time-to-altitude, coupled with advanced avionics and weapons systems.
The Eurofighter Typhoon entered British service with the Royal Air Force (RAF) in 2003, following the acceptance of the first operational aircraft. The RAF initially introduced the Typhoon in an air-defense role to replace the aging Tornado F3s. By the late 2000s, it was upgraded to perform multi-role operations, including precision ground-attack missions. The Typhoon was deployed in its first combat operation during the 2011 Libyan Civil War, where RAF Typhoons enforced a no-fly zone and conducted strike missions. The aircraft has since become a cornerstone of the RAF’s capabilities, with upgrades ensuring its relevance in modern warfare.
The variant discussed here is the 6th Eurofighter Typhoon Instrumented Production Aircraft, or IPA.6. IPA.6 was built as a single seat Tranche 1 Block 5 airframe, but prior to the first flight was modified to a block 8 standard. As an IPA, it is brimming with telemetry recording hardware to monitor all aspects of its flying, in order to test and analyse performance and compatibility with new weapons systems, prior to their introduction in to service.
Operated by BAE since 2007, it is no exaggeration to call this machine the workhorse of the UKs Eurofighter fleet. With over 700 completed flights, and over 1000 flight hours, it is responsible for a great deal of Eurofighter ‘firsts’, including being the first Typhoon to mount and launch Brimstone IIs. It has also been involved in the mounting and integration of the Meteor, Storm Shadow, and Mk84 bombs.
In game, as a one-off aircraft, when the time comes, this would be ideal to introduce as a squadron vehicle or perhaps premium (I know we dislike top tier premiums but they are unfortunately inevitable), alongside production standard aircraft like the FGR.4 which belong in the tech tree.
Specifications
Spoiler
Armament:
• 1 x BK27 Mauser Cannon (150rpg)
• 2-6 x ASRAAM
• 4-6 x Meteor/AMRAAM
• 6-8 x Paveway LGBs
• 12 x Brimstone
• 12 x Spear 3
• 3 x Storm Shadow
• 2 x ALARM
• Litening Targetting Pod
Airframe:
• Crew: 1
• Length: 15.96 m (52 ft 4 in)
• Wingspan: 10.95 m (35 ft 11 in)
• Height: 5.28 m (17 ft 4 in)
• Wing area: 51.2 m2 (551 sq ft)
• Empty weight: 11,000 kg (24,251 lb)
• Gross weight: 16,000 kg (35,274 lb)
• Max takeoff weight: 23,500 kg (51,809 lb)
• Fuel capacity: 4,996 kg (11,010 lb) / 6,215 L (1,642 US gal; 1,367 imp gal) internal
• Powerplant: 2 × Eurojet EJ200 afterburning turbofan engines, 60 kN (13,000 lbf) thrust each dry, 90 kN (20,000 lbf) with afterburner
• Maximum speed: Mach 2.0+ (2,495 km/h) - 1,530 km/h (950 mph; 830 kn) / Mach 1.25 at sea level
• Supercruise: Mach 1.5
• Range: 2,900 km (1,800 mi, 1,600 nmi)
• Combat range: up to 1,389 km with 3 × external 1,000 l tanks
• Ferry range: 3,790 km (2,350 mi, 2,050 nmi) with 3 × drop tanks
• Service ceiling: 19,812 m (65,000 ft)
• G limits: +9 / -3
• Rate of climb: 315 m/s (62,000 ft/min) - 150 m/s average to 9000m(30,000ft)
• Acceleration: Mach 0.3 → Mach 1 in 30s.
• Wing loading: 312 kg/m2 (64 lb/sq ft)
• Thrust/weight: 1.15 (interceptor configuration)