Challenger 2 MBT - Technical data and Discussion (Part 1)

WIP moment i imagine.

we are very sure…


![War Thunder Screenshot 2024.03.05 - 13.47.25.42|1000x562](upload://wwJmpl5rt54a6I8qRwHZS58cpaY.jpegI
Still wrong?

Poorly made by me rn
Pin
image
Pin lock (imagine it is all filled)
image

so youre saying the locks is what fills the holes. cause right now what gaijin is thinking is that the rotor pins are part of the rotor.

when you look at it theyr assumption is that its correct the way it is. the pins are allready there and they are part of the rotor structure.

Yes, the pin should go to the end, and lock fill the rest

yes but what you see on the left there for gaijing will be the pin

yea, if they decide to leave it like that it will have to be reported

2 Likes

Is the length of test server L94A1 correct?

lol ithink someone will have to go tell gaijin that. i can almost guarantee thats not what theyre seeing

oh yea, @Fireball_2020 im not mixing it up, right? It is just like i say or its different?

Dunno

wtf youre 1 step ahead of me :(

Happens :)

I think it is toooo short

hey as anyone checked if the spall liner was put into the sides of the hull like it was reported?

which report?

It is not yet reported. We are still waiting for the rest of the photos

image

ah ok i saw the photos and thought it was. nvm